About Us
Established in April 2016, XiongMing Aviation Science Industry (Wuhu) co.,LTD covers an area of 4.16 hectares and is located in Wuhu Aviation Industrial Park. It is one of the few companies in the world that has the ability to design and manufacture three kinds of couplings: hirth couplings, curvic couplings and fan-shaped couplings. XiongMing has obtained more than 40 patents around the core business of couplings and passed the IS9001 and national military standard system certification. As a provincial high-tech enterprise, XiongMing was rated as a specialized, innovative and expertise-based new-type enterprise. There are more than 60 employees and 23 technical personnel. XiongMing has a wide range of precision machining capabilities and has many precision testing equipment, including a variety of high-precision grinding machines, Zeiss three coordinates, roundness tester, contour graph, optical collimator, etc.

The main business is precision couplings, which are called class A parts by the Japanese machinery industry. It is also a part that European and American aero-engine enterprise generally do not want to outsource. Couplings are widely used in aerospace engines, gas turbines, nuclear electric pumps, railway locomotives and Industrial machine fields. Representative customers are: Rolls-Royce, SIEMENS, DOOSAN, MAZAK, KENNAMETA, DEDIENNE AEROSPACE, HTC, ENN, WTB, CASC, Shaan Gu, CRRC, NGC, HAITIAN, WUZHONG, KEDE, etc.


XiongMing is committed to manufacture precision couplings and high-precision machining, cultivating international craftsmen, pursuing industrial chain development, and be a responsible entity.



COMPANY DEVELOPMENT

2011year
The first shareholders' meeting was held
April 2016
Settled in Wuhu Aviation Industrial Park
April 2019
Realize the mass production of three types of end gear coupling
August 2023
Established Xiongming Precision Machinery (Shanghai) Co.,Ltd
December 2015
Established Xiongming Aviation Technology & Industry Co.,Ltd
August 2017
Production base expansion and relocation
August 2020
The second phase of the plant was completed, with a total construction area of 24,000 square meters
PARTNER